An accurate construction estimate gives the team a basis for budgeting and planning. For labor, that means more than a total cost: operations needs to understand the work, the hours allowed and when qualified crews will be needed.
Table of Contents
Improving the forecasting process allows for more effective planning in the foresight of potential issues, allowing for more timely and budget-conscious completion. Utilizing additional tools to assist with calculating expenses can further maximize efficiency.
This blog post and guide will explore the importance of accurate estimating in the construction industry. We’ll provide tips for improving precision and connecting the estimate to the people who will deliver the work.
What is construction estimating?
Construction estimating is the process of predicting the monetary cost of a project. In other words, it involves determining the total and complete price associated with conceiving and building certain structures.
This forecasting process often links with the construction bidding process. In general, it involves considering factors like building materials, equipment rental prices, employee wages, and design specifications.
To correctly forecast construction costs, professionals must thoroughly review all relevant documentation to factor in client requirements.
Accurate estimating is essential for proper project planning, as it allows professionals to provide their clients with the best prediction of key expenses.
The key components to consider in construction estimating
To accurately determine the cost of a project, it’s important to consider several key components.
Labor
Labor forms a significant portion of direct construction expenses. Consider employee or laborer wages, as payroll will significantly contribute to overall costs. Remember to consider overhead and other indirect costs as well, factoring in insurance, permits, and management fees.
You may want to think about the rates associated with different employee skill levels. Other factors affecting the price tag of labor include availability and location.
It may also help to utilize historical data and industry benchmarks. Referencing past projects and industry standards helps provide accurate cost measurements.
Project scope and design
Understanding the project’s scope allows for more accurate forecasting of the resources required. The project’s design should also be detailed and well-defined to minimize uncertainty.
It’s vital to get a clear understanding of potential costs by consulting designers and architects. Getting their input helps obtain all the necessary information and clarify any ambiguity.
Building materials and equipment
Accurate estimates rely on identifying and quantifying any required building materials. Another significant factor to consider is the rental or purchase amount of equipment. These factors will greatly influence the project’s resulting profit margins. In this regard, quantity surveying can be incredibly valuable.
Make sure to pay attention to fluctuations in the market to ensure more precise estimations.
Who is responsible for construction estimating?
Construction estimators are responsible for calculating and determining all project costs. They work with project managers to review all documents related to the proposed job and use tools like spreadsheets and software programs to calculate expenses based on their findings and experience.
Employing a professional estimator is important for businesses in the industry, as it gives the job a reliable cost basis. It’s especially vital for large projects, as a lack of due diligence can cause budgets to quickly spiral out of control.
Estimators work in tandem with general contractors, subcontractors, architecture professionals, and other workers.
By predicting costs carefully, they reduce the chance of surprises once building starts.
The key benefits of accurate construction estimating
Accurate estimating plays a vital role in the success of any project. Here are just a few advantages.
- Timely completion
Use the estimate to identify the labor and procurement assumptions behind the schedule. Review when crews, materials and equipment will be needed, then check whether those requirements can be met. An estimate can inform the plan without guaranteeing the completion date.
- Budget control
Compare expected costs with the budget while there is still time to revise the scope, procurement approach or staffing plan. Keep the assumptions visible as prices, quantities and project conditions change. An accurate starting estimate still needs review during delivery.
- Enhanced customer satisfaction
Improving how you conduct cost forecasting helps build trust and credibility with customers. When you complete projects according to expectations, you’re bettering the customer experience, whether for individual stakeholders or a larger corporation. They’ll have confidence in your ability to deliver as promised and are more likely to recommend your services to others.
Needless to say, precise forecasts bring multiple benefits, including timely completion, budget control, and enhanced customer satisfaction. It serves as a solid foundation for proper project execution and contributes to the overall success of construction businesses.
How to improve construction estimating
Improve an estimate by testing its labor assumptions against past projects and the people who will deliver the work. Compare the hours allowed with similar completed jobs, confirm the trade and qualification mix, and revisit the figures when scope or prices change. If you are building that capability in-house, review the skills needed for construction estimating.
How do estimated labor hours become a weekly crew plan?
Break the labor allowance into work packages, identify when each package is expected to run and compare the demand with the crews available. Spread each package’s hours across the weeks it runs to get weekly labor demand, then divide each week’s hours by the hours one crew member is planned to work that week. The result is the headcount that week needs. Before confirming assignments, review that figure with the people responsible for delivery, including the working pattern, scope, productivity and qualification assumptions behind it.
| Estimate input | Planning question | People to involve |
|---|---|---|
| Hours allowed for a work package | Over which weeks will the work take place? | Estimating and project delivery. |
| Trade and qualification requirements | Which crew can cover the work? | Labor coordination and field leadership. |
| Expected sequence | What changes if a predecessor activity moves? | Project delivery and the crew leads. |
Keep estimated hours, planned assignments and actual hours distinct when reviewing a gap. Check whether the scope or sequence changed before deciding what to adjust.
Bridgit’s crew planning and labor forecasting help specialty contractors plan people across projects. Use the workforce plan to test the people and timing behind an estimate; it does not replace the estimating process.
Save on costs by improving labor management
Review the estimate and the workforce plan together before committing a crew. If the required hours, timing or qualifications cannot be covered, make the gap explicit and agree on the next step with estimating and project delivery.
If you’re looking for ways to get a handle on your labor force to potentially save and maximize efficiency, consider Bridgit.
Bridgit is an all-in-one workforce management solution that allows professionals to make informed bidding and staffing decisions and plan their workforce strategically.
Request a demo with Bridgit today.